2018 Green island township Zhongnantun settlement sewage natural purification conservation plan

Absrtact
In order to assist the Taitung County Environmental Protection Bureau in the implementation of the operation of the Nanhaitun settlement sewage natural purification plant in Green Island Township and the environmental maintenance of the site, and to implement the project, we hope that the public will understand the natural purification method of sewage. After treatment, it can be discharged to the sea in accordance with the discharge water standard, which will not only pollute the ocean, but also become a model for water resources recycling. The project has been completed since March 1, 2007, and the main work items are: I. Site environment and plant maintenance and finishing: The maintenance of the landscape is achieved by regularly trimming the weeds and cleaning the environment. Second, the interception system, processing system operation and maintenance: The regular operation and maintenance of the site system can timely detect system anomalies and report repairs, and clear and maintain the intercepting system to facilitate the normal operation of the system to achieve processing results. Third, water quality monitoring: Completion of 6 water quality monitoring in accordance with the relevant procedures, sampling at 3/26, 5/16, 6/25, 7/23, 8/22, 10/17, recording local water quality changes, understanding the treatment efficiency of the sewage purification system, and Analyze the data results. 4. Prepare and modify the on-site operation manual of “Facilities Operation and Maintenance” in this case: The preparation of the operation manual allows personnel to understand the on-site system equipment. This year's field update flowmeter has been compiled into the operation manual and printed on the 10/4 to complete the delivery to the Environmental Protection Agency. V. Consolidation analysis of the “Water Quality Monitoring and Engineering Effectiveness Evaluation Report” of this case, as well as the data report and operation record of the relevant inspection results in the 101~106 and this (107) years of this case: the results of the 6 water quality test data completed this year and 101~ The results of the 106-year survey have been compiled and put into the "Water Quality Monitoring and Engineering Effectiveness Assessment Report" and submitted to the Environmental Protection Bureau on 11/23. Sixth, the same agency to handle the Green Island Zhongnantun water purification treatment system function test: 4/24 and 9/12 with the project contractor to the site to complete the system function test. 7. Within 10 days from the completion of the signing date and at the end of October, 107, the same authorities will go to the case area to handle the overall inspection of the equipment. Within 10 days after the overall inspection, the “Zhongnanjing Settlement Sewage Natural Purification and Conservation Project Improvement Work Plan” will be submitted. Eight, the production of sewage natural purification and conservation as the theme of the propaganda. IX. Handling Organs, Green Island Township Office and Local Operators Education and Training: Invite Professor Zhou Zhiru to the office of Zhongnantun Village, Ludao Township for education and training in 6/5. The number of participants reached 41, and the participants will apply after the course. The number of environmental education hours will enhance the understanding of the Green Island Township Office. 10. Provide human and material support. XI. Other cooperation and coordination of related work. The results of the implementation of this project are as follows: 1. On March 7th, the first overall inspection of the facility was carried out, and the improvement work was completed on April 8, 107, and the system processing efficiency was restored. Second, the implementation of the project began to December 31, 107, the environment and plant maintenance and finishing a total of 319.9 kg. 3. The project implements the discharge well and the sewage collection aeration tank to clean the bottom sludge. The sand and gravel sludge cleared in the current (107) year (from March 1 to December 31, 2007) is operated. Personnel are moved to the inter-brick area for use as a fine material for biological treatment. 4. In addition to the improvement and repair of the intercepting channel of the intercepting system of Nanxun and Zhongmu, the maintenance and repair of the signboard in the field, the repair of the water valve switch box in the field, and the correction and repair of the flow pipe of the inlet and outlet flowmeters are also carried out. Maintenance work after the overall inspection of the equipment such as the shelter box. 5. The plan will be held on May 24th for a publicity briefing session and on June 5th for a total of 2 training sessions. The total number of participants will be 98. The first session will be directed to the restaurant and accommodation industry in Ludao Township. The general public will discharge the pollution, oil and water separation, and explain the concepts and benefits of reducing the load on the treatment equipment and the environmental pollution in the sea area. The second sub-system will explain the principle of natural purification of sewage and lead the participants to understand the sewage treatment operation in this case. The process is to enhance the understanding of the Green Island Township Office on the natural purification and conservation of sewage in this case.
Keyword
Taitung , 2007, natural purification plant
Open
top